This article covers the practical differences between EMT and PVC, where each belongs, and the considerations that decide it.
EMT in brief
Electrical metallic tubing is thin wall steel conduit, typically galvanised. It is the most common raceway in commercial interior work.
Characteristics:
Rigid, providing mechanical protection for the conductors inside
Can serve as the equipment grounding conductor when properly installed with approved fittings
Bends with a hand bender or mechanical bender, allowing precise field fitting
Assembled with compression or set screw fittings rather than adhesive
Not permitted where subject to severe physical damage
PVC in brief
PVC conduit is rigid nonmetallic raceway, most commonly schedule 40 for general use and schedule 80 where greater wall thickness is needed.
Characteristics:
Corrosion resistant, which is its primary advantage
Requires a separate equipment grounding conductor, since it cannot carry ground
Joined with solvent cement, creating a permanent bond
Bends with heat, or with manufactured elbows and fittings
Expands and contracts significantly with temperature change
Where EMT belongs
EMT is the default for commercial interior work and suits:
Exposed runs in commercial buildings, warehouses and plant rooms
Locations requiring mechanical protection
Installations where the raceway serving as equipment ground simplifies the pull
Work requiring field adjustment, since it can be cut and bent on site
Runs that may need modification later, since fittings are mechanical rather than bonded
Where PVC belongs
PVC suits environments that would attack steel:
Underground and direct burial applications
Wet locations and areas subject to washdown
Corrosive environments including chemical storage and some agricultural settings
Concrete encasement
Coastal locations with salt exposure
It is also lighter and generally cheaper per foot, which matters on long runs.
The grounding difference
This is the most consequential practical difference and it is worth stating plainly.
Properly installed EMT with approved fittings can serve as the equipment grounding conductor. The raceway itself provides the ground path.
PVC cannot. Every PVC run requires a separate equipment grounding conductor pulled with the circuit conductors.
That has consequences for conduit fill, for conductor cost and for labour. A PVC run carrying three conductors plus a ground has different fill arithmetic than an EMT run carrying three conductors alone. Factoring this in at the estimate stage avoids discovering it during the pull.
Thermal expansion
PVC expands and contracts with temperature far more than steel. On long exposed runs, particularly outdoors or in unconditioned spaces, this movement is substantial enough to require expansion fittings.
Ignoring it produces buckled runs, stressed joints and separated connections. The expansion characteristics are published by manufacturers, and the calculation depends on run length and the temperature range the installation will see.
Short interior runs in conditioned space rarely need expansion fittings. Long exterior runs almost always do.
Support requirements
Both types require support at intervals, and the intervals differ.
EMT support spacing is generally more forgiving, given the material rigidity
PVC requires closer support, particularly at smaller diameters, because it sags under its own weight
Straps, hangers and standoff supports are specified by conduit size and type. Using strapping intended for one on the other is a common and avoidable inspection item.
Fittings and assembly
EMT uses compression or set screw connectors and couplings. Compression fittings are required in wet locations and generally provide a more reliable mechanical and electrical connection. Set screw fittings are cheaper and adequate for dry interior work.
PVC uses solvent cement, which chemically welds the joint. The bond is permanent. Proper technique matters, including correct cement for the material, adequate coverage and holding the joint while it sets. Dry fitting the entire run before cementing saves considerable frustration.
Mixing the two
Transitions between EMT and PVC are routine and entirely acceptable with appropriate adapters. A common pattern is PVC for the underground portion, transitioning to EMT where the run comes above grade and into the building.
Where the transition occurs, the equipment grounding conductor must be continuous through the PVC section and properly bonded at the transition.
Choosing in practice
A reasonable decision sequence:
Is the run underground, wet, or in a corrosive environment? PVC
Is it exposed interior commercial work? EMT
Is mechanical protection a priority? EMT, or rigid metal conduit where severe damage is possible
Is the run long and exposed to temperature swings? PVC needs expansion provision, EMT does not
Does the design rely on the raceway as equipment ground? EMT
Is cost per foot the binding constraint over a long run? PVC, factoring in the extra ground conductor
The other options
EMT and PVC cover most situations, but two further types come up often enough to mention.
Rigid metal conduit is thick wall threaded steel. It provides substantially greater mechanical protection than EMT and is used where damage is likely, in hazardous locations, and for service entrance work in some jurisdictions. It is heavier, more expensive, and requires threading rather than compression fittings, which slows installation considerably. Intermediate metallic conduit sits between EMT and rigid, with a thinner wall than rigid but still threaded.
Liquidtight flexible conduit handles connections to equipment that vibrates or needs to move. The obvious application is the final connection to a heat pump condenser, a motor, or a rooftop unit. Rigid raceway terminating directly into vibrating equipment transmits that vibration into the structure and eventually fatigues the connection. A short liquidtight section isolates it. Metallic and nonmetallic versions exist, with the metallic type providing mechanical protection and the nonmetallic type greater corrosion resistance.
Practical cutting and bending notes
A few points that affect the quality of the finished run.
Cut EMT square. An angled cut does not seat properly in a fitting and the connection suffers
Ream every cut. Burrs left inside the conduit will strip insulation during the pull, and the damage is invisible once the conductor is in place
Mark bends from a consistent reference point, since take up varies by conduit size and bender
Dry fit PVC runs completely before applying cement, because once the joint is made it is permanent
Allow cement to set properly before pulling, as disturbing a green joint breaks the bond
Keep PVC cement capped, since it evaporates quickly and thickened cement makes poor joints
For property owners
You will not choose conduit, but if you are comparing quotes, a contractor specifying PVC underground and EMT inside is following normal practice. One proposing EMT for a buried run should be asked about corrosion protection.
Where to buy
NAEHVAC stocks EMT and PVC conduit in common trade sizes at our Yonkers warehouse, along with the full range of fittings, connectors, couplings, elbows, straps, hangers, clamps and conduit bodies needed to complete a run.
We supply contractors throughout Westchester County and the New York metropolitan area. If you are working out a materials list for a job with a mixed raceway specification, our team can go through it with you at the counter.